Structural Engineering
Geotechnical Engineering
24 gates, 434,756 sf
30,000 square-foot Big Room for design and construction collaboration
Concrete Innovations: 2024 Award Winner;
World’s first certified LEED BD+C New Construction Platinum v4.0/4.1 Terminal in 2022;
2022 AIA Design Awards, Harvey Milk Terminal 1 received the Climate Action Award for leadership in the development of energy, carbon, water and resource-related practices and policies
R+C provided structural and geotechnical engineering for the Boarding Area B (B/A B) renewal of SFO’s Harvey Milk Terminal 1 which was completed in three phases to minimize disruptions to airport operations. Part of a $2B project to modernize the Terminal 1, the new B/A B is divided into three levels and includes lounges, concessions, and numerous public art instillations. The calming light-filled space was designed to support SFO’s vision of a next-generation travel experience. This project is LEED Platinum.
Photographer Feature Image: Joe Fletcher
SE
Leavening peerless structural engineering skill with humor, philosophy, people skills and, above all, a consummate understanding of San Francisco's permitting process, [Alan] saw this project through.